South African IP · Power and grid architectures
Cleaner, steadier power systems — designed as licensable architectures
Licensable intellectual property for power systems and grid architectures, developed in South Africa for license-ready integration by engineering and industrial partners.
You do not need a physics degree to start. Open GMAS or CNRD, read the public summary, then request the folder that sits behind the NDA.
Choose a room
Where do you want to go?
Opening figures · 1 September 2026
What it costs to start
These are licence figures, not NERSA electricity tariffs and not a cart. NDA is free. Full terms after the NDA.